shearcheck AISC 360-22
Feedback Try it yourself →

Sample result

AISC DE II.A-17A sample

This is a live sample output for the connection in AISC Design Example II.A-17A: a W16×50 (A992) beam to a 0.710-in support flange through a 1/4 × 11-1/2 × 4-1/2 in A572-50 plate with four 3/4-in Group 120 (N) bolts and 3/16-in two-sided fillet welds, under Vu = 49.6 kip / Va = 33.0 kip. Run your own connection to get a downloadable .docx report.

LRFD
PASS

φRn = 58.5 kip ≥ Vu = 49.6 kip

ASD
PASS

Rn/Ω = 39 kip ≥ Va = 33 kip

Limit states

Limit state Rn (kip) φRn (kip) Rn/Ω (kip)
shear yield 86.25 86.25 57.5
shear rupture governs 78 58.5 39
block shear 87.34 65.51 43.67
weld 128.1 96.06 64.04
bolt group 78.26 58.7 39.13

Bolt-group coefficient C = 3.556 at e = a/2 = 1.5 in; instantaneous center of rotation converged in 8 iterations (Brandt, AISC Engineering Journal Q2 1982).

Dimensional checks

Check Status Note
plate thickness <= db/2 + 1/16 OK t = 0.25 vs 0.4375 (conventional config, DE II.A-17A)
beam web thickness <= db/2 + 1/16 OK tw = 0.38 vs 0.4375
edge distances >= Table J3.4 minimum OK min(lev, leh) = 1.25 vs 1 (pinned)
bolt spacing >= 2-2/3 db OK s = 3 vs 2 (J3.4)
leh >= 2 db OK leh = 1.5 vs 1.5
plate depth fits bolt group OK depth = 11.5 vs (n-1)s + 2 lev = 11.5
plate depth <= beam T OK depth = 11.5 vs T = 13.62 (pinned envelope: plate within the web's workable flat)
weld size >= 5/8 plate t OK w = 0.1875 vs 0.1562 (DE II.A-17A rule)
support thickness (Manual Eq. 9-6) OK tf = 0.71 vs 3.09*D/Fu = 0.1426 (D = 3 sixteenths, Fu = 65 ksi A992)

Every limit state matches two independent blind derivations to within 0.001%, and the printed values of AISC Design Example II.A-17A to within 1%, with the same governing limit state at published precision. How this engine is verified →

Download

Calculation aid, not a sealed design. Connection design responsibility follows AISC 303-22 Section 3.1.2 as assigned in the contract documents; the engineer of record or connection design engineer must review and seal. Not affiliated with AISC.

Planned

Multi-connection schedule document — one submittable package for every shear tab on the job. For now, each connection is its own document.

Generated by shearcheck · Foundry Core Labs